Tuesday, April 27, 2010

ACN rest of the Programs

Click on the link below to download ACN Programs and Output

ACN Program and Printout


Click on the link below to download AMP Programs and Output

AMP all programs and Output

OOSE Assignment 2


1.Explain testing strategies.

2.Write Short note on:
a]Software Configuration management
b]Re-engineering.

3.How to convert following relation into Java code.
a]one-to-one
b]one-to-many
c]many-to-many
d]Generalization

Answer to question 3 will be uploaded soon........

Sunday, April 25, 2010

ACN Experiment 6th and 8th Notice

ACN Expt No 8.
Aim : To study a) Proxy server
b) DNS server
c) Mail server
d)Testing and measuring networks
Batch B3 will prepare writeup for (a) and (b) part of expt no. 8
Batch B4 will prepare writeup for (c) and (d) part of expt no. 8
Batch B1 will prepare writeup for Expt No 6. Aim: Group chatting.

This is inform students of TE comp Batch B1, B3 and B4 that they should submit me soft copy of the write-ups 2day (24/04/2010) before 5.00 p.m. itself. It is deadline for the students of batch TE comp Batch B1, B3 and B4.

Puja Padiya
Lecturer in Computer Engg Dept
Ramrao Adik Institue of Technology
Nerul
Navi Mumbai

Thursday, April 22, 2010

SPCC NOTICE

Final Submission date for Spcc file is 30th of April
Practical and Oral will be conducted on 7th,8th and 10th

SPCC Program Uploaded

Click here to download the file

SPCC Program

ACN Program with Output (ALL) Uploaded

Click here to download

ACN PROGRAM

Tuesday, April 20, 2010

Imp Note About Seminar

Take only one printout of seminar report per team.

Mail your ppt and report of seminar on ajinkyagadkari@gmail.com
mam will be taking it from him

OOSE Assignment 1

Q1. Explain open source software development process.

Q2. Consider a project to develop a full screen editor. The major components identified are screen edit, command language interpreter, file input and output, cursor movement, screen movement. The sizes for these are estimated to be 4K, 2K, 1K, 2K and 3K delivered source lines. Use COCOMO model to estimate overall cost of software and cost of different schedules.

Q3. Explain task set selector value.

Q4. Short Note on : Project Scheduling and Tracking.

Wednesday, April 7, 2010

SPCC Final Manual

Click on the below link to download

SPCC Final Manual

Friday, April 2, 2010

ACN Chat Server Program

Click on the link below to download

ACN CHATSERVER

ACN 4th Experiment

To study packet grab and analysis
Click on the link below to download

Wireshark Experiment